Report on operations

                                   Government/ENAV Program and Service Agreements

                                        Concerning the 2013–2015 Planning and Service Contracts, the last technical
                                        meetings between ENAV representatives and the representatives of the competent
                                        national institutions were held during the year for the purpose of starting to work
                                        on the above mentioned contracts once negotiations have been completed. The
                                        agreement drafts and the relative attachments were consolidated on the basis of
                                        what was agreed and sent to the Interministerial Committee for Economic Planning
                                        (CIPE), for an opinion. As a result of the national regulations applicable in 2015, upon
                                        receipt of notification from the CIPE to the effect that there were “no objections”,
                                        the drafts were sent to the competent parliamentary commissions for a definitive
                                        opinion which is a prerequisite for signing the contracts. In the first semester of
                                        2015 the VIII Senate Public Works Commission and the IX House of Representatives
                                        Transport Commission, having examined the planning contract drafts between the
                                        Ministry of Infrastructure and Transport and ENAV for the 2013–2015 three-year
                                        period expressed their favourable opinion for signing the contracts.
                                        Following such positive response, the contracts were officially signed by the parties’
                                        signatories towards the end of 2015.
                                        In order to further the stature of ENAV and to ensure greater certainty and stability
                                        in its legal relationships and coherence between the national setup of air navigation
                                        services regulations and the European reference regulatory framework, the 2016
                                        Stability Law No. 208/2015 defined the term of the Planning Contract to coincide
                                        with the term of the national performance plan. In the first instance, a four-year
                                        term regulating a period going from 1 January 2016 to 31 December 2019 was
                                        established.
                                        Moreover, it was decided that the new 2016–2019 Planning Contract be signed by
                                        the parties by the end of April 2016.
                                        Towards this end, the Company together with the reference institutional bodies
                                        started the process of drafting the new Planning Contract at the end of 2015 and
                                        delivered a new draft in February 2016.

                                   Military Airports

                                        In relation to the transfer of air navigation services of the military airports that are
                                        also open to civilian traffic to ENAV, while Planning and Services Contracts are in
                                        the process of being signed, in 2015 ENAV, having taken cognisance of the requests
                                        of the control bodies to take over the provision of air navigation services from the
                                        Italian Air Force, started the preliminary technical activities that are necessary for
                                        the take-over of the services in those airports where the take-over was not made in
                                        the previous year. Having concluded the updating and modernization phase of the
                                        systems and the equipment used for Air Traffic Control in the airports that were in
                                        the process of being taken over, for the purpose of adapting the technology and the
                                        quality standards of the service to the same levels as in those airports that were
                                        managed by the Company at the time, in 2015 ENAV took over the air navigation